Difference between revisions of "Oversight Board/Meeting Minutes-2024-08-28"

From Sugar Labs
Jump to navigation Jump to search
 
(7 intermediate revisions by the same user not shown)
Line 24: Line 24:
 
* The Gen-AI Lesson Plan project is wrapping up and is awesome.
 
* The Gen-AI Lesson Plan project is wrapping up and is awesome.
 
* Sugar on RPi is a much better experience now. We need to promote it.
 
* Sugar on RPi is a much better experience now. We need to promote it.
 +
 +
(The students who worked on RPi had come up with some promotional materials, so we can use those.)
  
 
Both GSoC and DMP projects are going good so far, tested some changes they made earlier today, the RPi students are trying to build an image, Ibiam made some changes after the errors Aayush noticed during his last test.
 
Both GSoC and DMP projects are going good so far, tested some changes they made earlier today, the RPi students are trying to build an image, Ibiam made some changes after the errors Aayush noticed during his last test.
 +
 +
The AI projects are a bit on hold until we figure out the resources issue. (Devin has been recommending https://console.groq.com/playground to students for now, as it runs LLAMA etc and is gratis.)
  
 
=== Sugar packages for Fedora ===
 
=== Sugar packages for Fedora ===
 +
 +
In an email dated 8/19, Ibiam said: "Quite a number of sugar packages - about 30 - have failed to build in F41, I looked at some of them but not in depth, I fixed some but that's a lot of packages and some are probably not issues with Sugar, I can draft up a contract to fix most if not all the packages if the board agrees."
 +
 +
+1 from Devin, Claudia, and Walter; Samson +1'd by email
  
 
=== GSoC resources ===
 
=== GSoC resources ===
 +
 +
There a plan to host something on our servers for dev purposes. (We need a different solution for deployment.)
 +
The plan is in regard to the collab server for MB, but it could just as well work for the AI projects. And then we move to AWS if that grant comes through (we should hear within a couple of weeks).
 +
 +
Follow the fun here: https://docs.google.com/spreadsheets/d/147PqxkIwP7R29WuGcOD1D54YzDPXnM-TYGiUkgAhaXg/edit?usp=sharing
 +
 +
Ibiam will follow up with hosting options.
  
 
=== Other ===
 
=== Other ===
 +
 +
Reminder: GSoC Final Evaluation Deadline is SEPTEMBER 02, 2024 2:00 PM (US Pacific Time)
  
 
Note that Constructionism 2025 will be held in Zurich, June 24 to June 27
 
Note that Constructionism 2025 will be held in Zurich, June 24 to June 27

Latest revision as of 15:49, 28 August 2024

August 28 Meeting

Oversight Board/Meeting Minutes-2024-08-28

Attending

  • Devin Ulibarri (SL executive director)
  • Claudia Urrea (SL Inc. board)
  • Walter Bender (SL Inc. board)
  • Ibiam Chihurumnaya (community member)

Absent

  • Lionel Laske (SL Inc. board)
  • Alex Perez (SL Inc. board)
  • Samson Goddy (SL In. board)

Agenda

  • GSoC and DMP report (Walter, Lionel, and Ibiam)
  • Discussion on Ibiam's proposal to update Sugar packages for Fedora
  • GSoC students require resources to deploy their AI projects.

GSoC and DMP report

  • The MIDI and ABC import code has landed.
  • The Gen-AI Lesson Plan project is wrapping up and is awesome.
  • Sugar on RPi is a much better experience now. We need to promote it.

(The students who worked on RPi had come up with some promotional materials, so we can use those.)

Both GSoC and DMP projects are going good so far, tested some changes they made earlier today, the RPi students are trying to build an image, Ibiam made some changes after the errors Aayush noticed during his last test.

The AI projects are a bit on hold until we figure out the resources issue. (Devin has been recommending https://console.groq.com/playground to students for now, as it runs LLAMA etc and is gratis.)

Sugar packages for Fedora

In an email dated 8/19, Ibiam said: "Quite a number of sugar packages - about 30 - have failed to build in F41, I looked at some of them but not in depth, I fixed some but that's a lot of packages and some are probably not issues with Sugar, I can draft up a contract to fix most if not all the packages if the board agrees."

+1 from Devin, Claudia, and Walter; Samson +1'd by email

GSoC resources

There a plan to host something on our servers for dev purposes. (We need a different solution for deployment.) The plan is in regard to the collab server for MB, but it could just as well work for the AI projects. And then we move to AWS if that grant comes through (we should hear within a couple of weeks).

Follow the fun here: https://docs.google.com/spreadsheets/d/147PqxkIwP7R29WuGcOD1D54YzDPXnM-TYGiUkgAhaXg/edit?usp=sharing

Ibiam will follow up with hosting options.

Other

Reminder: GSoC Final Evaluation Deadline is SEPTEMBER 02, 2024 2:00 PM (US Pacific Time)

Note that Constructionism 2025 will be held in Zurich, June 24 to June 27