Summer of Code/2016/Redesign and recreate suugarlabs web appearance: Difference between revisions

Venky18 (talk | contribs)
Tag: visualeditor
Venky18 (talk | contribs)
Tag: visualeditor
Line 33: Line 33:
** Loading time – Enabling compression, optimizing css, reducing number of plugins, minifying resources and minimizing   HTTP requests will improve loading time.
** Loading time – Enabling compression, optimizing css, reducing number of plugins, minifying resources and minimizing   HTTP requests will improve loading time.
** SEO
** SEO
I will focus on the above things while designing a website . If possible then I will add openid connect to the wiki login page. I will be using HTML, CSS, JavaScript, Jquery for web pages and grid layout flexbox(?) or bootstrap(?) or foundation( ?)  
I will focus on the above things while designing a website . If possible then I will add openid connect to the wiki login page. I will be using HTML, CSS, JavaScript, Jquery for web pages and flexbox(?) or bootstrap(?) or foundation( ?) for grid layout.
* '''What is the timeline for development of your project? The Summer of Code work period is from mid-May  to mid-August; tell us what you will be working on each week. (As the summer goes on, you and your mentor will adjust your schedule, but it's good to have a plan at the beginning so you have an idea of where you're headed.) Note that you should probably plan to have something "working and 90% done" by the midterm evaluation (end of June); the last steps always take longer than you think, and we will consider cancelling projects which are not mostly working by then.'''
* '''What is the timeline for development of your project? The Summer of Code work period is from mid-May  to mid-August; tell us what you will be working on each week. (As the summer goes on, you and your mentor will adjust your schedule, but it's good to have a plan at the beginning so you have an idea of where you're headed.) Note that you should probably plan to have something "working and 90% done" by the midterm evaluation (end of June); the last steps always take longer than you think, and we will consider cancelling projects which are not mostly working by then.'''