Changes

Line 57: Line 57:     
* For complex patches you might want to start with an overall design of the patch.
 
* For complex patches you might want to start with an overall design of the patch.
* Make sure the submitted provided a testcase before approving the patch
+
* Make sure the submitter provided a testcase before approving the patch
 
* Change the r? keyword to r- to indicate that the patch needs work.
 
* Change the r? keyword to r- to indicate that the patch needs work.
 
* Change the r? keyword to r+ if the patch is ok to be pushed.
 
* Change the r? keyword to r+ if the patch is ok to be pushed.