Changes

122 bytes added ,  16:11, 25 October 2010
Line 127: Line 127:  
==Milestones - Fall 2010==
 
==Milestones - Fall 2010==
 
* By Week 7
 
* By Week 7
** <s>Gain git access</s>
+
** <s>Gain git access (.5 hrs) </s>
** <s>Evaluate game direction and idea</s>
+
** Evaluate game direction and idea (2 hrs)
** <s>Determine whether to reuse or refuse the current PacMath code</s>
+
** <s>Determine whether to reuse or refuse the current PacMath code (.5 hrs)</s> - Reuse
 
<br/>
 
<br/>
 
* By Week 8
 
* By Week 8
** Document game idea and play
+
** Document game idea and play (2 hrs)
** Decide on feedback mechanism (Score, Lives, …)
+
** Decide on feedback mechanism (Score, Lives, …) (1 hr)
** Refactor collision detection system
+
** Refactor collision detection system (5 hrs)
 
<br/>
 
<br/>
 
* By Week 9
 
* By Week 9
** Sugarize the activity
+
** Sugarize the activity (5 hrs)
** Implement multiple level capability
+
** Implement multiple level capability (5 hrs)
** Refine ghost movement
+
** Refine ghost movement (5 hrs)
 
<br/>
 
<br/>
 
* By Week 10
 
* By Week 10
** Improve game speed
+
** Improve game speed (5 hrs)
** Beautify game, intuitively redesign the UI
+
** Beautify game, intuitively redesign the UI (5 hrs)
 
<br/>
 
<br/>
 
* By Week 11
 
* By Week 11
** Finishing touches
+
** Finishing touches (2 hrs)
** Usability testing
+
** Usability testing (2 hrs)
** Release evaluation
+
** Release evaluation (1 hr)
** Potential release
+
** Potential release (1 hr)
 
<br/>
 
<br/>
 
Division of Labor:
 
Division of Labor: