Mchua (talk | contribs)
Mchua (talk | contribs)
Line 20: Line 20:


I tend to set my goals in 6-month cycles mirroring the Sugar release schedule, so these are my goals for the the 0.86 release cycle (March 1, 2009 - September 1, 2009). This list is super-flexible; stuff changes all the time, random cool ideas come up, and so this has deliberately been planned with lots of wiggle room. As things change, I (usually remember to) edit this page to reflect that.
I tend to set my goals in 6-month cycles mirroring the Sugar release schedule, so these are my goals for the the 0.86 release cycle (March 1, 2009 - September 1, 2009). This list is super-flexible; stuff changes all the time, random cool ideas come up, and so this has deliberately been planned with lots of wiggle room. As things change, I (usually remember to) edit this page to reflect that.
* Maintainer of the [http://git.sugarlabs.org/projects/irc IRC Activity].
* Working on an [[Activity development sprint]] with Jerome Gotangco and a deployment in the Philippines.
* Testing the 0.84 release, focusing on the development and execution of [[smoke test]] procedures by working with the Olin College team's sprint cycles driven by Elsa Culler and Colin Zwiebel. After smoke testing is solid, I plan on working to improve the quality of bugs filed in Trac.
* Doing QA for the [[AddonsPortal]] project. Need to set down testing and feedback cycles for that.
* Helping out with odd jobs for [[MarketingTeam]], mostly involving community development (right now: clarifying the distinction between university chapters, ambassadors, Local Labs, geographic interest groups, and deployment teams, alongside the DeploymentTeam).
* Google Summer of Code 2009 coordination, along with other spring/summer '09 internship/mentorship initiatives.
* [[MarketingTeam/Sugar_stories|Interviewing Sugar Labs contributors]] for profiles for the 0.84 press release on March 15


== History ==
== History ==


I do stuff. This page needs a facelift.
I do stuff. This page needs a facelift.