Math4Team/RIT/Projects/Math Maze: Difference between revisions

TS1593 (talk | contribs)
TS1593 (talk | contribs)
Line 3: Line 3:
==Implemented Domains==
==Implemented Domains==
==Future Plans==
==Future Plans==
Because we just started the project we need to design and develop everything. We will look at other projects to try and get a grip on some of it to lessen our work load as well as develop a proper schedule to keep us on track.
==How To Play==
==How To Play==
==Project Files==
==Project Files==