'''Week 4''' (October 4 - October 10)
 
'''Week 4''' (October 4 - October 10)
   −
* work on prototyping of tougher game elements
+
* <s>work on prototyping of tougher game elements</s>
    
* <s>create class structure</s>
 
* <s>create class structure</s>
Line 512: Line 512:  
* <s>begin coding combat system</s>
 
* <s>begin coding combat system</s>
   −
&rarr; get the 'combat stage' set up for functionality
+
&rarr; <s>get the 'combat stage' set up for functionality</s>
    
* <s>work on placeholder graphics to be loaded into game</s>
 
* <s>work on placeholder graphics to be loaded into game</s>
Line 521: Line 521:  
* <s>finish travel system</s>
 
* <s>finish travel system</s>
   −
&rarr; <s> debug any issues or conflicts</s>
+
&rarr; <s>debug any issues or conflicts</s>
   −
&rarr; <s> text notifications of choices</s>
+
&rarr; <s>text notifications of choices</s>
   −
&rarr; <s> polish it off to fully working</s>
+
&rarr; <s>polish it off to fully working</s>
    
* finish combat system
 
* finish combat system
   −
&rarr; have exchange of turns
+
&rarr; <s>have exchange of turns</s>
   −
&rarr; menu that works for choices
+
&rarr; <s>menu that works for choices</s>
   −
&rarr; text notification for choices
+
&rarr; <s>text notification for choices</s>
    
&rarr; basic battle is functional from start to finish
 
&rarr; basic battle is functional from start to finish
   −
* switch between travel and combat system from main world
+
* <s>switch between travel and combat system from main world</s>
       
'''Week 8''' (November 1 - November 7)
 
'''Week 8''' (November 1 - November 7)
   −
* begin working on GUI and Menu systems
+
* <s>begin working on GUI and Menu systems</s>
   −
&rarr; set up in game
+
&rarr; <s>set up in game</s>
   −
&rarr; make functional
+
&rarr; <s>make functional</s>
       
'''Week 9''' (November 8 - November 14)
 
'''Week 9''' (November 8 - November 14)
   −
* work on actual graphics (sets) and load them into game (replace placeholders)
+
* <s>game design documentation!</s>
   −
* finish off all primary projects to ensure one play through of one level can happen start to finish
+
&rarr; <s>extremely detailed account of current project and future goals/ directions.</s>
 
  −
* game design documentation!
  −
 
  −
&rarr; extremely detailed account of current project and future goals/ directions.
  −
 
  −
* work on data recognition
  −
 
  −
&rarr; this is updating the topics around the players level of familiarity with a given topic. make sure older topics are still rotated in for reiteration.
      
* additional features:
 
* additional features:
Line 576: Line 568:  
'''Week 10+''' (November 14 - November 28)
 
'''Week 10+''' (November 14 - November 28)
   −
* TESTING!
+
* <s>catch up to milestones</s>
 +
 
 +
* <s>test copy of game thus far</s>
 +
 
 +
&rarr: <s>improve elements</s>
 +
 
 +
* <s>KEEP TESTING AND ADDING CONTENT!</s>
   −
* KEEP TESTING AND ADDING CONTENT
+
* <s>more time granted!</s>
       
'''Week 11''' (November 29 - December 5)
 
'''Week 11''' (November 29 - December 5)
 +
 +
* finish implementing Battle Menus.
 +
 +
&rarr; add in final graphics for battle menus.
 +
 +
&rarr; add division and geometry attacks
 +
 +
* finish alpha version of the Battle Engine
 +
 +
&rarr; integrate and test the Battle Engine with the Battle Menus and Main game.
 +
 +
* begin level designing
       
'''Week 12''' (December 6 - December 12)
 
'''Week 12''' (December 6 - December 12)
 +
 +
* fix bugs in Battle Engine.
 +
 +
* add equipment, items, and bosses into Battle System
 +
 +
* improve enemy battle AI.
 +
 +
* add more special attacks.
 +
 +
* begin Advanced testing of beta Battle Engine.
 +
 +
* polish level design
 +
 +
* make dungeons
       
'''Week 13+''' (December 13 - January 2, 2010)
 
'''Week 13+''' (December 13 - January 2, 2010)
 +
 +
* finish fixing bugs in Battle Engine.
 +
 +
* design door locks/puzzles
 +
 +
* rapid prototyping of door locks and puzzles
 +
 +
* design puzzle rooms
 +
 +
* allow for a play through with multiple dungeons
 +
 +
* Usability Testing
 +
 +
* user group meeting @ RIT's Innovation Center, thursday 7-9pm
       
'''Week 14''' (January 3 - January 9)
 
'''Week 14''' (January 3 - January 9)
 +
 +
* redesign based on user tests
 +
 +
&rarr; code to reflect design changes
 +
 +
* add more puzzles and levels
 +
 +
* test new puzzles and levels.
 +
 +
* begin work on Shop feature
       
'''Week 15''' (January 10 - January 16)
 
'''Week 15''' (January 10 - January 16)
 +
 +
* finish shop feature
 +
 +
* integrate Shop with main game
 +
 +
* complete Beta version of game
 +
 +
* user testing
 +
 +
* start designing/scripting storyline
 +
 +
* start designing teacher side tools
       
'''Week 16''' (January 17 - January 23)
 
'''Week 16''' (January 17 - January 23)
 +
 +
* begin coding Teacher Level Creator
 +
 +
* begin coding student stat system
 +
 +
* add more art assets (music, sound effects, art)
       
'''Week 17''' (January 24 - January 30)
 
'''Week 17''' (January 24 - January 30)
 +
 +
* finalize all official level designs, and implement in game
 +
 +
* continue coding level editor
 +
 +
* continue coding stats system
 +
 +
* finalize storyline
 +
 +
* create and implement story and cut scenes
 +
 +
* user group meeting @ RIT's Innovation Center, thursday 7-9pm
 +
 +
* retest levels and add in updated art work as needed
       
'''Week 18''' (January 31 - February 6)
 
'''Week 18''' (January 31 - February 6)
 +
 +
* add in additional sounds/cut scenes
 +
 +
* add in stats or re design stages if needed
 +
 +
* finish Stat System
 +
 +
* finish Level editor
 +
 +
* integrate into one teacher GUI
       
'''Week 19''' (February 7 - February 13)
 
'''Week 19''' (February 7 - February 13)
 +
 +
* user tests of teacher GUI
 +
 +
* re-design/re-code phase
 +
 +
* compile game into xo activity
 +
 +
* compile teacher gui into xo activity
 +
 +
* make different story/art assets available based on locale
       
'''Week 20+''' (February 14 - March 7)
 
'''Week 20+''' (February 14 - March 7)
 +
 +
* final debugging/design/coding
 +
 +
* packaging and advertisement
 +
 +
* run final user test and globailzition checks
 +
 +
* finalize localization options
 +
 +
* release activity for XO
       
'''Future+''' (March 8+)
 
'''Future+''' (March 8+)
 +
 +
* pending
    
== Future Development ==
 