Changes

Jump to navigation Jump to search
200 bytes removed ,  14:59, 8 July 2010
Line 17: Line 17:     
==To-Do==
 
==To-Do==
Rewrite front end for GTK and move away from Tk
+
Polish up the GUI for the Teacher and Student and test functionality
*Paper prototyping and digitized version
  −
*User testing of paper prototype
     −
Testing of mesh networking back-end
+
Integrate and test networking code and or look at other programs that use mesh networking and fit code to PopQuiz use.
   −
Future:
+
Test all integrated code, track bugs
Support many types of questions
+
 
Detailed results analysis
+
Begin user testing (need to find an environment, ping Math4)
*"Build a quiz mode"
+
 
*Sending of a series of questions versus just individual questions
+
Fix bugs and edit features if need be from results of testing.
 +
 
 +
Deploy
    
==Milestones==
 
==Milestones==
Line 34: Line 34:  
   - Know python and have dev environment set up
 
   - Know python and have dev environment set up
 
   - Get group members
 
   - Get group members
Date
  −
  - To be done by end of RIT's winter break (1/4/2010)
   
</strike>  
 
</strike>  
   −
2) Create Student User Interface
+
<strike>2) Create Student User Interface
 
  Need
 
  Need
   <strike>- Able to accept input from user </strike>
+
   - Able to accept input from user
 
   - Transition from screen to screen smoothly
 
   - Transition from screen to screen smoothly
   <strike>- Gathers all of the desired information easily </strike>
+
   - Gathers all of the desired information easily  
Date
+
</strike>
  - Concurrent development with Teacher UI (2/14/10)
      +
<strike>
 
3) Create Teacher User Interface
 
3) Create Teacher User Interface
 
  Need
 
  Need
Line 52: Line 50:  
   - Stores all the information in a format easily sent over networks
 
   - Stores all the information in a format easily sent over networks
 
   - Able to display all of the class information regardless of number of students (up to 15)
 
   - Able to display all of the class information regardless of number of students (up to 15)
Date
+
</strike>
  - Concurrent development with Student UI (2/14/10)
      
4) Get Networking working
 
4) Get Networking working
Line 60: Line 57:  
   - Students are able to join activity
 
   - Students are able to join activity
 
   - Information is able to be passed from student XO to teacher XO
 
   - Information is able to be passed from student XO to teacher XO
Date
+
 
  - To be as done as possible by end of class (Week of 2/14/2010)
   
5) Test
 
5) Test
 
  Need
 
  Need
Line 68: Line 64:  
  Date
 
  Date
 
   - As long as there is support for the project
 
   - As long as there is support for the project
 +
 
6) Add features
 
6) Add features
 
  Need
 
  Need
25

edits

Navigation menu