Changes

Jump to navigation Jump to search
m
Line 94: Line 94:  
Both decisions would be made by SLOBs or a decision panel convened by the SLOBs. This issue is a peripheral one that isn't particularly within the scope of the current SoaS discussions in this thread, though.
 
Both decisions would be made by SLOBs or a decision panel convened by the SLOBs. This issue is a peripheral one that isn't particularly within the scope of the current SoaS discussions in this thread, though.
   −
== Determine what a "SL Project" is ==
+
=== Determine what a "SL Project" is ===
    
* What are the criteria for being a SL project?
 
* What are the criteria for being a SL project?
779

edits

Navigation menu