Changes

Jump to navigation Jump to search
28 bytes removed ,  07:13, 17 January 2011
no edit summary
Line 55: Line 55:       −
The board should be plugged in switched on before clicking the "Connect" button. When the board is switched on, the green LED lights up, the beeper beeps and the programmable LED flashes a couple of times. When clicking the "Connect" button watch out for the red LED near the USB connector, which should flash when the XO and GoGo-Board communicate. If the red LED does not flash then the GoGo activity will have failed to connect and you should consult the "[http://wiki.sugarlabs.org/go/Activity/Gogo#Failing_To_Connect Failing_To_Connect]" section on this page. All being well the connection status should show "GoGo Connected" along with the port being used in the status-bar, as shown below:
+
The board should be plugged in switched on before clicking the "Connect" button. When the board is switched on the green LED lights up, the beeper beeps and the programmable LED flashes a couple of times. When clicking the "Connect" button watch out for the red LED near the USB connector, which should flash when the XO and GoGo-Board communicate. If the red LED does not flash then the GoGo activity will have failed to connect and you should consult the [[Activity/Gogo#Failing_To_Connect|"Failing To Connect"]] section on this page. All being well the connection status should show "GoGo Connected" along with the port being used in the status-bar, as shown below:
     
35

edits

Navigation menu